• Waste Management FacilitySouthwark

Oran Pre-Cast provided the concrete structural elements for this Waste Management Facility in Southwark Borough

CLIENTVeolia Environmental Services
MAIN CONTRACTOR Volker Fitzpatrick
ENGINEER Royal Haskoning
PRECAST VALUE €1.1m
ONSITE DURATION 8 weeks

The project consisted of over 4,000m2 of twinwall, lattice floor capping slabs and precast beam elements. A full design of the wall panels was carried out in house, accounting for impact forces from the waste sorting excavator buckets, along with various point reactions from gantries and mechanical sorting equipment.

 

Key design features included:

  • Walls of up to 7m in height

  • Cast in protective steel impact plates

  • 450mm thick capping slabs

  • 350mm thick twinwall

  • All installed within the structure, under very restricted lifting conditions