• Hilton Tower of London

Oran Pre-Cast provided the main concrete structure for this 583 room, 11 storey, central London hotel
CLIENTMint Hotel
MAIN CONTRACTOR Laing O'Rourke
ARCHITECT Bennetts Associates
ENGINEER Buro Happold
PRECAST VALUE €4.3m
ONSITE DURATION 26 weeks

A precast crosswall solution was provided, using our twinwall and lattice floor products. The repetitive nature of the accommodation levels was ideally suited to precast concrete. Bespoke beams and columns were provided as required in other areas of the hotel.

The reduction in onsite works associated with precast concrete construction was of high value on this busy city centre site. Our logistics team operated a just in time delivery programme to ensure the precast panels could be lifted directly into position, eliminating the need for onsite product storage.


Key facts:

  • 10,000m2 of twinwall

  • 16,000 m2 of lattice floors

  • Over 2,500 unique production drawings

  • Concrete Society Sustainability Award Nominee