
Oran Precast worked closely with the consulting engineer and main contractor to provide a total precast solution for this project
MAIN CONTRACTOR | Burkeway |
ARCHITECT | OKM |
ENGINEER | HGL O'Connor |
PRECAST VALUE | €2m |
ONSITE DURATION | 20 weeks |
This development consists of retail, office and residential units over a basement carpark. The building forms the focal point of the bustling Lisbaun Industrial Estate.
Key design features included:
-
Precast column and beam structure
-
Twinwall staircores and liftshafts
-
Hollowcore flooring throughout
-
Interface connection between insitu base slab and precast frame