The last component of the main precast frame was installed in February 2017. Since then, follow-on trades including installation of Roof Steelwork, M&E, Blockwork and Stud Partitions, Stone and finishes have been ongoing. Oran Precast were re-contracted to provide a number of free-standing cantilever external walls and columns which form the perimeter walls and gated entrances for the Courthouse on the Mulgrave Street side and within the Secure Yard which abutts the nearby Limerick Prison Walls. 8m high 300mm thick walls were provided around the Secure Yard at the rear of the building.